Post a reply
   Attach screenshots
Heads necessary to send messages to enable JavaScript
Add an Attachment

If you do not want to add an Attachment to your Post, please leave the Fields blank

Topic review
Message
03-Apr-2024 06:15 ivani
It depends on the lightship draft and the hydrostatic curves also, You must have those things to estimate the draft with load ( assuming that it doesn't pitch)
02-Apr-2024 16:50 erickp21
If i want to load lets say 24135 MT of iron ore in a ship, how much draft will the ship has by the end of the loading operations?
I have some information if needed:
DWT: 43479.3 mt
Summer Draft: 10.7 meters
Deductible weights: 700 mt
tpc: 54.7
Density of the water: 0.996
LOA: 189.99
LBP: 186.65
BREATH MOULDED: 30
Lightship: 10072.5

The time now is: Today 08:21

All times are GMT + 3 Hours